default search action
European Journal of Operational Research, Volume 165
Volume 165, Number 1, August 2005
- Charles S. Revelle, Horst A. Eiselt:

Location analysis: A synthesis and survey. 1-19 - Gur Mosheiov:

Minimizing total completion time and total deviation of job completion times from a restrictive due-date. 20-33 - Rubén Ruiz

, Concepción Maroto
, Javier Alcaraz
:
Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics. 34-54 - Thomas Dunker

, Günter Radons
, Engelbert Westkämper:
Combining evolutionary computation and dynamic programming for solving a dynamic facility layout problem. 55-69 - Michel Vasquez, Yannick Vimont:

Improved results on the 0-1 multidimensional knapsack problem. 70-81 - Francis Sourd:

Optimal timing of a sequence of tasks with general completion costs. 82-96 - Daniel Villeneuve, Guy Desaulniers

:
The shortest path problem with forbidden paths. 97-107 - Hoon Jung, Cerry M. Klein:

Optimal inventory policies for an economic order quantity model with decreasing cost functions. 108-126 - Linda van Norden, Steef L. van de Velde:

Multi-product lot-sizing with a transportation capacity reservation contract. 127-138 - Subhashish Samaddar, Gad Rabinowitz

, Guoqiang Peter Zhang:
An experimental analysis of solution performance in a resource sharing and scheduling problem. 139-156 - Amiya K. Chakravarty:

Global plant capacity and product allocation with pricing decisions. 157-181 - Erdem Eskigun, Reha Uzsoy

, Paul V. Preckel
, George Beaujon, Subramanian Krishnan, Jeffrey D. Tew:
Outbound supply chain network design with mode selection, lead times and capacitated vehicle distribution centers. 182-206 - Hartanto Wong, Dirk Cattrysse

, Dirk Van Oudheusden:
Inventory pooling of repairable spare parts with non-zero lateral transshipment time and delayed lateral transshipments. 207-218 - Selwyn Piramuthu:

Knowledge-based framework for automated dynamic supply chain configuration. 219-230 - Abraham Grosfeld-Nir:

A two-bottleneck system with binomial yields and rigid demand. 231-250 - Manipushpak Mitra

:
Incomplete information and multiple machine queueing problems. 251-266 - Kevin D. Glazebrook, H. M. Mitchell, P. S. Ansell:

Index policies for the maintenance of a collection of machines by a set of repairmen. 267-284
Volume 165, Number 2, September 2005
- Vicente Valls, Jan Weglarz

:
Project management and scheduling. 285-288 - Willy Herroelen, Roel Leus

:
Project scheduling under uncertainty: Survey and research potentials. 289-306 - Salah E. Elmaghraby:

On the fallacy of averages in project risk management. 307-313 - Christian Artigues, Jean-Charles Billaut, Carl Esswein:

Maximization of solution flexibility for robust shop scheduling. 314-328 - Anand A. Paul, Genaro Gutierrez:

Simple probability models for project contracting. 329-338 - Can Akkan

, Andreas Drexl, Alf Kimms:
Network decomposition-based benchmark results for the discrete time-cost tradeoff problem. 339-358 - Mario Vanhoucke

:
New computational results for the discrete time/cost trade-off problem with time-switch constraints. 359-374 - Vicente Valls, Francisco Ballestín

, M. Sacramento Quintanilla
:
Justification and RCPSP: A technique that pays. 375-386 - Sergey V. Sevastianov

:
An introduction to multi-parameter complexity analysis of discrete problems. 387-397 - Peter Brucker, Sigrid Knust, Guoqing Wang:

Complexity results for flow-shop problems with a single server. 398-407 - Jacek Blazewicz

, Erwin Pesch, Malgorzata Sterna
, Frank Werner
:
The two-machine flow-shop problem with weighted late work criterion and common due date. 408-415 - Adam Janiak, Mikhail Y. Kovalyov

, Wieslaw Kubiak, Frank Werner
:
Positive half-products and scheduling with controllable processing times. 416-422 - T. C. Edwin Cheng

, C. T. Ng
, Jinjiang Yuan, Zhaohui Liu:
Single machine scheduling to minimize total weighted tardiness. 423-443 - T. C. Edwin Cheng

, Natalia V. Shakhlevich
:
Minimizing non-decreasing separable objective functions for the unit-time open shop scheduling problem. 444-456 - Marco Ghirardi

, Chris N. Potts:
Makespan minimization for scheduling unrelated parallel machines: A recovering beam search approach. 457-467 - Gaurav Singh

:
Scheduling UET-UCT outforests to minimize maximum lateness. 468-478 - Rubén Ruiz

, Concepción Maroto
:
A comprehensive review and evaluation of permutation flowshop heuristics. 479-494 - Klaus Neumann, Christoph Schwindt, Norbert Trautmann

:
Scheduling of continuous and discontinuous material flows with intermediate storage restrictions. 495-509 - Francis Sourd, Jerome Rogerie:

Continuous filling and emptying of storage systems in constraint-based scheduling. 510-524 - Ramón Alvarez-Valdés, Ariadna Fuertes

, José Manuel Tamarit, Guillermo Giménez, Rafael Ramos:
A heuristic to schedule flexible job-shop in a glass factory. 525-534 - Philippe Lacomme, Christian Prins

, Wahiba Ramdane-Chérif:
Evolutionary algorithms for periodic arc routing problems. 535-553
Volume 165, Number 3, September 2005
- Marc Demange, Vangelis Th. Paschos:

Polynomial approximation algorithms with performance guarantees: An introduction-by-example. 555-568 - Morten Riis, Kim Allan Andersen:

Applying the minimax criterion in stochastic recourse programs. 569-584 - Xinmin Yang, X. Q. Yang, Kok Lay Teo, S. H. Hou:

Multiobjective second-order symmetric duality with F. 585-591 - Seema Khurana:

Symmetric duality in multiobjective programming involving generalized cone-invex functions. 592-597 - Predrag S. Stanimirovic

, Nebojsa V. Stojkovic, Vera V. Kovacevic-Vujcic:
Stabilization of Mehrotra's primal-dual algorithm and its implementation. 598-609 - Daniela Ambrosino

, Maria Grazia Scutellà:
Distribution network design: New problems and related models. 610-624 - Hanif D. Sherali, Youngho Lee, Youngjin Kim:

Partial convexification cuts for 0-1 mixed-integer programs. 625-648 - Claudio T. Bornstein, Luciane Ferreira Alcoforado, Nelson Maculan:

A graph-oriented approach for the minimization of the number of late jobs for the parallel machines scheduling problem. 649-656 - Ching-Wu Chu

:
A heuristic algorithm for the truckload and less-than-truckload problem. 657-667 - Ann Melissa Campbell

, Jill R. Hardin:
Vehicle minimization for periodic deliveries. 668-684 - Wen Lea Pearn, Chien-Wei Wu

:
A Bayesian approach for assessing process precision based on multiple samples. 685-695 - Eyas Shuiabi, Vincent Thomson, Nadia Bhuiyan:

Entropy as a measure of operational flexibility. 696-707 - Jannes Slomp, Nallan C. Suresh:

The shift team formation problem in multi-shift manufacturing operations. 708-728 - Loo Hay Lee

, Ek Peng Chew:
A dynamic joint replenishment policy with auto-correlated demand. 729-747 - Ronald S. Tibben-Lembke, Yehuda Bassok:

An inventory model for delayed customization: A hybrid approach. 748-764 - Byung-Kook Kang:

Optimal stopping problem with double reservation value property. 765-785 - Vanderlei da Costa Bueno:

Minimal standby redundancy allocation in a k. 786-793 - Scott E. Grasman, Tava Lennon Olsen

, John R. Birge
:
Finite buffer polling models with routing. 794-809 - Nihal Pekergin, Tugrul Dayar

, Denizhan N. Alparslan:
Componentwise bounds for nearly completely decomposable Markov chains using stochastic comparison and reordering. 810-825 - Jack P. C. Kleijnen, Wim C. M. van Beers:

Robustness of Kriging when interpolating in random simulation with heterogeneous variances: Some experiments. 826-834 - Jung-Fa Tsai, Han-Lin Li:

Technical note - On optimization approach for multidisk vertical allocation problems. 835-842 - Zhongjun Tian, C. T. Ng

, T. C. Edwin Cheng
:
On the single machine total tardiness problem. 843-846

manage site settings
To protect your privacy, all features that rely on external API calls from your browser are turned off by default. You need to opt-in for them to become active. All settings here will be stored as cookies with your web browser. For more information see our F.A.Q.


Google
Google Scholar
Semantic Scholar
Internet Archive Scholar
CiteSeerX
ORCID