


default search action
Journal of Scheduling, Volume 10
Volume 10, Number 1, February 2007
- Edmund K. Burke

, Michael L. Pinedo, Steef L. van de Velde:
Editorial. 3-4 - Jonathan F. Bard, Hadi W. Purnomo:

Cyclic preference scheduling of nurses using a Lagrangian-based heuristic. 5-23 - Luca Quadrifoglio

, Maged M. Dessouky, Kurt Palmer:
An insertion heuristic for scheduling Mobility Allowance Shuttle Transit (MAST) services. 25-40 - Karthik Sourirajan, Reha Uzsoy

:
Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication. 41-65 - Denise Sato Yamashita, Vinícius Amaral Armentano, Manuel Laguna:

Robust optimization models for project scheduling with resource availability cost. 67-76 - Xiaoqiang Cai, Xianyi Wu

, Xian Zhou
:
Single-machine scheduling with general costs under compound-type distributions. 77-84
Volume 10, Number 2, April 2007
- Jacek Blazewicz

, Edmund K. Burke
, Klaus Ecker, Erwin Pesch, Denis Trystram:
Selected papers from the Dagstuhl workshop. 85-86 - Jacek Blazewicz

, Erwin Pesch, Malgorzata Sterna
, Frank Werner
:
A note on the two machine job shop with the weighted late work criterion. 87-95 - Albert Corominas, Wieslaw Kubiak, Natalia Moreno Palli:

Response time variability. 97-110 - Marc Demange, Dominique de Werra, Jérôme Monnot, Vangelis Th. Paschos:

Time slot scheduling of compatible jobs. 111-127 - Adam Janiak, Tomasz Krysiak:

Single processor scheduling with job values depending on their completion times. 129-138 - Philippe Baptiste, Peter Brucker, Marek Chrobak, Christoph Dürr, Svetlana A. Kravchenko, Francis Sourd:

The complexity of mean flow time scheduling problems with release times. 139-146 - Dirk Christian Mattfeld:

Conference diary. 147-149
Volume 10, Number 3, June 2007
- Erik Demeulemeester, Willy Herroelen:

Introduction to the special issue: project scheduling under uncertainty. 151-152 - Francisco Ballestín

:
When it is worthwhile to work with the stochastic RCPSP? 153-166 - Guidong Zhu, Jonathan F. Bard, Gang Yu:

A two-stage stochastic programming approach for project planning with uncertain activity durations. 167-180 - Izack Cohen

, Boaz Golany, Avraham Shtub:
Resource allocation in stochastic, finite-capacity, multi-project systems through the cross entropy methodology. 181-193 - Stijn Van de Vonder, Erik Demeulemeester, Willy Herroelen:

A classification of predictive-reactive project scheduling procedures. 195-207 - Cyril Briand, Hoang Trung La, Jacques Erschler:

A robust approach for the single machine scheduling problem. 209-221 - Roel Leus

, Willy Herroelen:
Scheduling for stability in single-machine production systems. 223-235
Volume 10, Numbers 4-5, 2007
- Byung-Cheon Choi

, Suk-Hun Yoon:
Maximizing the weighted number of just-in-time jobs in flow shop scheduling. 237-243 - Mikel Lezaun, Gloria Pérez

, Eduardo Sáinz de la Maza
:
Rostering in a rail passenger carrier. 245-254 - Dvir Shabtay

, George Steiner:
Single machine batch scheduling to minimize total completion time and resource consumption costs. 255-261 - Enrico Angelelli

, Maria Grazia Speranza
, Zsolt Tuza:
Semi on-line scheduling on three processors with known sum of the tasks. 263-269 - Kerem Bülbül

, Philip M. Kaminsky, Candace A. Yano:
Preemption in single machine earliness/tardiness scheduling. 271-292 - Xiaoqiang Cai, Liming Wang, Xian Zhou

:
Single-machine scheduling to stochastically minimize maximum lateness. 293-301 - Yong He, Qi Wei

, T. C. E. Cheng
:
Single-machine scheduling with trade-off between number of tardy jobs and compression cost. 303-310 - Mario Vanhoucke

, Dieter Debels:
The discrete time/cost trade-off problem: extensions and heuristic procedures. 311-326 - Marcello Sammarra

, Jean-François Cordeau, Gilbert Laporte, Maria Flavia Monaco
:
A tabu search heuristic for the quay crane scheduling problem. 327-336 - Conference diary. 337-339

Volume 10, Number 6, December 2007
- Liron Yedidsion, Dvir Shabtay

, Moshe Kaspi
:
A bicriteria approach to minimize maximal lateness and resource consumption for scheduling a single machine. 341-352 - C. T. Ng

, Mikhail Y. Kovalyov
:
Batching and scheduling in a multi-machine flow shop. 353-364 - Rongheng Li, Huei Chuen Huang:

List scheduling for jobs with arbitrary release times and similar lengths. 365-373 - Véronique Bouffard, Jacques A. Ferland:

Improving simulated annealing with variable neighborhood search to solve the resource-constrained scheduling problem. 375-386 - M. J. Bester, I. Nieuwoudt, Jan H. van Vuuren

:
Finding good nurse duty schedules: a case study. 387-405 - Deshi Ye, Guochuan Zhang

:
On-line scheduling of parallel jobs in a list. 407-413

manage site settings
To protect your privacy, all features that rely on external API calls from your browser are turned off by default. You need to opt-in for them to become active. All settings here will be stored as cookies with your web browser. For more information see our F.A.Q.


Google
Google Scholar
Semantic Scholar
Internet Archive Scholar
CiteSeerX
ORCID














