Journal Articles
- 2025
- [j82]Haohua Zhang, Erik Demeulemeester, Lubo Li, Sijun Bai:
Surrogate-assisted cooperative learning genetic programming for the resource-constrained project scheduling problem with stochastic activity durations and transfer times. Comput. Oper. Res. 173: 106816 (2025) - 2024
- [j81]Fatemeh Rezaei, Amir Abbas Najafi, Erik Demeulemeester, Reza Ramezanian:
A stochastic bi-objective project scheduling model under failure of activities. Ann. Oper. Res. 338(1): 453-476 (2024) - [j80]Baofeng Tian, Jingwen Zhang, Erik Demeulemeester, Hao Liu:
A chance-constrained optimization approach integrating project scheduling and material ordering to manage the uncertain material supply. Comput. Oper. Res. 166: 106624 (2024) - [j79]Li-En Wang, Erik Demeulemeester, Nancy Vansteenkiste, Frank E. Rademakers:
Capacity and surgery partitioning: An approach for improving surgery scheduling in the inpatient surgical department. Eur. J. Oper. Res. 313(1): 112-128 (2024) - [j78]Jiaojiao Li, Jianghan Zhu, Guansheng Peng, Jianjiang Wang, Lu Zhen, Erik Demeulemeester:
Branch-Price-and-Cut algorithms for the team orienteering problem with interval-varying profits. Eur. J. Oper. Res. 319(3): 793-807 (2024) - [j77]Jingwen Zhang, Lubo Li, Erik Demeulemeester, Haohua Zhang:
A three-dimensional spatial resource-constrained project scheduling problem: Model and heuristic. Eur. J. Oper. Res. 319(3): 943-966 (2024) - [j76]Fotios Petropoulos, Gilbert Laporte, Emel Aktas, Sibel A. Alumur, Claudia Archetti, Hayriye Ayhan, Maria Battarra, Julia A. Bennell, Jean-Marie Bourjolly, John E. Boylan, Michèle Breton, David Canca, Laurent Charlin, Bo Chen, Cihan Tugrul Cicek, Louis Anthony Cox, Christine S. M. Currie, Erik Demeulemeester, Li Ding, Stephen M. Disney, Matthias Ehrgott, Martin J. Eppler, Günes Erdogan, Bernard Fortz, L. Alberto Franco, Jens Frische, Salvatore Greco, Amanda J. Gregory, Raimo P. Hämäläinen, Willy Herroelen, Mike Hewitt, Jan Holmström, John N. Hooker, Tugçe Isik, Jill Johnes, Bahar Yetis Kara, Özlem Karsu, Katherine Kent, Charlotte Köhler, Martin H. Kunc, Yong-Hong Kuo, Adam N. Letchford, Janny Leung, Dong Li, Haitao Li, Judit Lienert, Ivana Ljubic, Andrea Lodi, Sebastián Lozano, Virginie Lurkin, Silvano Martello, Ian G. McHale, Gerald Midgley, John D. W. Morecroft, Akshay Mutha, Ceyda Oguz, Sanja Petrovic, Ulrich Pferschy, Harilaos N. Psaraftis, Sam Rose, Lauri Saarinen, Saïd Salhi, Jing-Sheng Song, Dimitrios Sotiros, Kathryn E. Stecke, Arne K. Strauss, Istenç Tarhan, Clemens Thielen, Paolo Toth, Tom Van Woensel, Greet Vanden Berghe, Christos Vasilakis, Vikrant Vaze, Daniele Vigo, Kai Virtanen, Xun Wang, Rafal Weron, Leroy White, Mike Yearworth, E. Alper Yildirim, Georges Zaccour, Xuying Zhao:
Operational Research: methods and applications. J. Oper. Res. Soc. 75(3): 423-617 (2024) - 2023
- [j75]Baofeng Tian, Jingwen Zhang, Erik Demeulemeester, Zhi Chen, Hassan Ali:
Integrated resource-constrained project scheduling and material ordering problem considering storage space allocation. Comput. Ind. Eng. 185: 109608 (2023) - [j74]Jianjiang Wang, Guopeng Song, Zhe Liang, Erik Demeulemeester, Xuejun Hu, Jin Liu:
Unrelated parallel machine scheduling with multiple time windows: An application to earth observation satellite scheduling. Comput. Oper. Res. 149: 106010 (2023) - [j73]Yong Ma, Zhengwen He, Nengmin Wang, Erik Demeulemeester:
Tabu search for proactive project scheduling problem with flexible resources. Comput. Oper. Res. 153: 106185 (2023) - 2022
- [j72]Wendi Tian, Yan Zhao, Erik Demeulemeester:
Generating a robust baseline schedule for the robust discrete time/resource trade-off problem under work content uncertainty. Comput. Oper. Res. 143: 105795 (2022) - [j71]Danial Khorasanian, Franklin Dexter, Erik Demeulemeester, Ghasem Moslehi:
Minimising the number of cancellations at the time of a severe lack of postanesthesia care unit beds or nurses. Int. J. Prod. Res. 60(11): 3383-3396 (2022) - [j70]Massimo Manzini, Erik Demeulemeester, Marcello Urgo:
A predictive-reactive approach for the sequencing of assembly operations in an automated assembly line. Robotics Comput. Integr. Manuf. 73: 102201 (2022) - 2021
- [j69]Fatemeh Rezaei, Amir Abbas Najafi, Reza Ramezanian, Erik Demeulemeester:
Simulation-based priority rules for the stochastic resource-constrained net present value and risk problem. Comput. Ind. Eng. 160: 107607 (2021) - [j68]Jianjiang Wang, Xuejun Hu, Erik Demeulemeester, Yan Zhao:
A bi-objective robust resource allocation model for the RCPSP considering resource transfer costs. Int. J. Prod. Res. 59(2): 367-387 (2021) - 2020
- [j67]Maria Elena Bruni, Sara Khodaparasti, Erik Demeulemeester:
The distributionally robust machine scheduling problem with job selection and sequence-dependent setup times. Comput. Oper. Res. 123: 105017 (2020) - [j66]Zhi Chen, Erik Demeulemeester, Sijun Bai, Yuntao Guo:
A Bayesian approach to set the tolerance limits for a statistical project control method. Int. J. Prod. Res. 58(10): 3150-3163 (2020) - [j65]Yangyang Liang, Nanfang Cui, Xuejun Hu, Erik Demeulemeester:
The integration of resource allocation and time buffering for bi-objective robust project scheduling. Int. J. Prod. Res. 58(13): 3839-3854 (2020) - [j64]Jianjiang Wang, Erik Demeulemeester, Xuejun Hu, Guohua Wu:
Expectation and SAA Models and Algorithms for Scheduling of Multiple Earth Observation Satellites Under the Impact of Clouds. IEEE Syst. J. 14(4): 5451-5462 (2020) - 2019
- [j63]Morteza Davari, Erik Demeulemeester:
Important classes of reactions for the proactive and reactive resource-constrained project scheduling problem. Ann. Oper. Res. 274(1-2): 187-210 (2019) - [j62]Zhiqiang Ma, Erik Demeulemeester, Zhengwen He, Nengmin Wang:
A computational experiment to explore better robustness measures for project scheduling under two types of uncertain environments. Comput. Ind. Eng. 131: 382-390 (2019) - [j61]Joren Marynissen, Erik Demeulemeester:
Literature review on multi-appointment scheduling problems in hospitals. Eur. J. Oper. Res. 272(2): 407-419 (2019) - [j60]Morteza Davari, Erik Demeulemeester:
A novel branch-and-bound algorithm for the chance-constrained resource-constrained project scheduling problem. Int. J. Prod. Res. 57(4): 1265-1282 (2019) - [j59]Yangyang Liang, Nanfang Cui, Tian Wang, Erik Demeulemeester:
Robust resource-constrained max-NPV project scheduling with stochastic activity duration. OR Spectr. 41(1): 219-254 (2019) - [j58]Morteza Davari, Erik Demeulemeester:
The proactive and reactive resource-constrained project scheduling problem. J. Sched. 22(2): 211-237 (2019) - [j57]Jianjiang Wang, Erik Demeulemeester, Xuejun Hu, Dishan Qiu, Jin Liu:
Exact and Heuristic Scheduling Algorithms for Multiple Earth Observation Satellites Under Uncertainties of Clouds. IEEE Syst. J. 13(3): 3556-3567 (2019) - [j56]Zhiqiang Ma, Zhengwen He, Nengmin Wang, Zhen Yang, Erik Demeulemeester:
A Genetic Algorithm for the Proactive Resource-Constrained Project Scheduling Problem With Activity Splitting. IEEE Trans. Engineering Management 66(3): 459-474 (2019) - 2018
- [j55]Philippe De Bruecker, Jeroen Beliën, Liesje De Boeck, Simon De Jaeger, Erik Demeulemeester:
A model enhancement approach for optimizing the integrated shift scheduling and vehicle routing problem in waste collection. Eur. J. Oper. Res. 266(1): 278-290 (2018) - [j54]Philippe De Bruecker, Jeroen Beliën, Jorne Van den Bergh, Erik Demeulemeester:
A three-stage mixed integer programming approach for optimizing the skill mix and training schedules for aircraft maintenance. Eur. J. Oper. Res. 267(2): 439-452 (2018) - [j53]Zhi Chen, Erik Demeulemeester, Sijun Bai, Yuntao Guo:
Efficient priority rules for the stochastic resource-constrained project scheduling problem. Eur. J. Oper. Res. 270(3): 957-967 (2018) - 2016
- [j52]Jianjiang Wang, Erik Demeulemeester, Dishan Qiu:
A pure proactive scheduling algorithm for multiple earth observation satellites under uncertainties of clouds. Comput. Oper. Res. 74: 1-13 (2016) - [j51]Xuejun Hu, Nanfang Cui, Erik Demeulemeester, Li Bie:
Incorporation of activity sensitivity measures into buffer management to manage project schedule risk. Eur. J. Oper. Res. 249(2): 717-727 (2016) - [j50]Rainer Kolisch, Erik Demeulemeester, Rubén Ruiz García, Vincent T'kindt, Jan Weglarz:
Editorial "Project Management and Scheduling". OR Spectr. 38(2): 279-281 (2016) - [j49]Dennis De Clerck, Erik Demeulemeester:
A sequential procurement model for a PPP project pipeline. OR Spectr. 38(2): 427-457 (2016) - [j48]Hongbo Li, Erik Demeulemeester:
A genetic algorithm for the robust resource leveling problem. J. Sched. 19(1): 43-60 (2016) - [j47]Morteza Davari, Erik Demeulemeester, Roel Leus, Fabrice Talla Nobibon:
Exact algorithms for single-machine scheduling with time windows and precedence constraints. J. Sched. 19(3): 309-334 (2016) - [j46]Patricio Lamas, Erik Demeulemeester:
A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations. J. Sched. 19(4): 409-428 (2016) - [j45]Michael Samudra, Carla Van Riet, Erik Demeulemeester, Brecht Cardoen, Nancy Vansteenkiste, Frank E. Rademakers:
Scheduling operating rooms: achievements, challenges and pitfalls. J. Sched. 19(5): 493-525 (2016) - 2015
- [j44]Narjes Sabeghi, Hamed Reza Tareghian, Erik Demeulemeester, Hassan Taheri:
Determining the timing of project control points using a facility location model and simulation. Comput. Oper. Res. 61: 69-80 (2015) - [j43]Philippe De Bruecker, Jorne Van den Bergh, Jeroen Beliën, Erik Demeulemeester:
Workforce planning incorporating skills: State of the art. Eur. J. Oper. Res. 243(1): 1-16 (2015) - [j42]Philippe De Bruecker, Jorne Van den Bergh, Jeroen Beliën, Erik Demeulemeester:
A model enhancement heuristic for building robust aircraft maintenance personnel rosters with stochastic constraints. Eur. J. Oper. Res. 246(2): 661-673 (2015) - [j41]Xiaomin Zhu, Jianjiang Wang, Xiao Qin, Ji Wang, Zhong Liu, Erik Demeulemeester:
Fault-Tolerant Scheduling for Real-Time Tasks on Multiple Earth-Observation Satellites. IEEE Trans. Parallel Distributed Syst. 26(11): 3012-3026 (2015) - 2014
- [j40]Stefan Creemers, Erik Demeulemeester, Stijn Van de Vonder:
A new approach for quantitative risk analysis. Ann. Oper. Res. 213(1): 27-65 (2014) - [j39]Wendi Tian, Erik Demeulemeester:
Railway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environment. Ann. Oper. Res. 213(1): 271-291 (2014) - 2013
- [j38]Jeroen Beliën, Erik Demeulemeester, Philippe De Bruecker, Jorne Van den Bergh, Brecht Cardoen:
Integrated staffing and scheduling for an aircraft line maintenance problem. Comput. Oper. Res. 40(4): 1023-1033 (2013) - [j37]Guoxuan Ma, Erik Demeulemeester:
A multilevel integrative approach to hospital case mix and capacity planning. Comput. Oper. Res. 40(9): 2198-2207 (2013) - [j36]Jorne Van den Bergh, Jeroen Beliën, Philippe De Bruecker, Erik Demeulemeester, Liesje De Boeck:
Personnel scheduling: A literature review. Eur. J. Oper. Res. 226(3): 367-385 (2013) - [j35]Jorne Van den Bergh, Philippe De Bruecker, Jeroen Beliën, Liesje De Boeck, Erik Demeulemeester:
A three-stage approach for aircraft line maintenance personnel rostering using MIP, discrete event simulation and DEA. Expert Syst. Appl. 40(7): 2659-2668 (2013) - 2012
- [j34]Jeroen Beliën, Brecht Cardoen, Erik Demeulemeester:
Improving Workforce Scheduling of Aircraft Line Maintenance at Sabena Technics. Interfaces 42(4): 352-364 (2012) - 2011
- [j33]Olivier Lambrechts, Erik Demeulemeester, Willy Herroelen:
Time slack-based techniques for robust project scheduling subject to resource uncertainty. Ann. Oper. Res. 186(1): 443-464 (2011) - [j32]Filip Deblaere, Erik Demeulemeester, Willy Herroelen:
RESCON: Educational project scheduling software. Comput. Appl. Eng. Educ. 19(2): 327-336 (2011) - [j31]Filip Deblaere, Erik Demeulemeester, Willy Herroelen:
Reactive scheduling in the multi-mode RCPSP. Comput. Oper. Res. 38(1): 63-74 (2011) - [j30]Filip Deblaere, Erik Demeulemeester, Willy Herroelen:
Proactive policies for the stochastic resource-constrained project scheduling problem. Eur. J. Oper. Res. 214(2): 308-316 (2011) - [j29]Brecht Cardoen, Erik Demeulemeester:
A Decision Support System for Surgery Sequencing at Uz Leuven's Day-Care Department. Int. J. Inf. Technol. Decis. Mak. 10(3): 435-450 (2011) - 2010
- [j28]Brecht Cardoen, Erik Demeulemeester, Jeroen Beliën:
Operating room planning and scheduling: A literature review. Eur. J. Oper. Res. 201(3): 921-932 (2010) - [j27]Erik Demeulemeester, Willy Herroelen:
Robust Project Scheduling. Found. Trends Technol. Inf. Oper. Manag. 3(3-4): 201-376 (2010) - 2009
- [j26]Brecht Cardoen, Erik Demeulemeester, Jeroen Beliën:
Sequencing surgical cases in a day-care environment: An exact branch-and-price approach. Comput. Oper. Res. 36(9): 2660-2669 (2009) - [j25]Jeroen Beliën, Erik Demeulemeester, Brecht Cardoen:
A decision support system for cyclic master surgery scheduling with multiple objectives. J. Sched. 12(2): 147-161 (2009) - 2008
- [j24]Jeroen Beliën, Erik Demeulemeester:
A branch-and-price approach for integrating nurse and surgery scheduling. Eur. J. Oper. Res. 189(3): 652-668 (2008) - [j23]Stijn Van de Vonder, Erik Demeulemeester, Willy Herroelen:
Proactive heuristic procedures for robust project scheduling: An experimental analysis. Eur. J. Oper. Res. 189(3): 723-733 (2008) - [j22]Brecht Cardoen, Erik Demeulemeester:
Capacity of Clinical Pathways - A Strategic Multi-level Evaluation Tool. J. Medical Syst. 32(6): 443-452 (2008) - [j21]Olivier Lambrechts, Erik Demeulemeester, Willy Herroelen:
Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities. J. Sched. 11(2): 121-136 (2008) - 2007
- [j20]Jeroen Beliën, Erik Demeulemeester:
On the trade-off between staff-decomposed and activity-decomposed column generation for a staff scheduling problem. Ann. Oper. Res. 155(1): 143-166 (2007) - [j19]Stijn Van de Vonder, Francisco Ballestín, Erik Demeulemeester, Willy Herroelen:
Heuristic procedures for reactive project scheduling. Comput. Ind. Eng. 52(1): 11-28 (2007) - [j18]Filip Deblaere, Erik Demeulemeester, Willy Herroelen, Stijn Van de Vonder:
Robust Resource Allocation Decisions in Resource-Constrained Projects. Decis. Sci. 38(1): 5-37 (2007) - [j17]Jeroen Beliën, Erik Demeulemeester:
Building cyclic master surgery schedules with leveled resulting bed occupancy. Eur. J. Oper. Res. 176(2): 1185-1204 (2007) - [j16]Erik Demeulemeester, Willy Herroelen:
Introduction to the special issue: project scheduling under uncertainty. J. Sched. 10(3): 151-152 (2007) - [j15]Stijn Van de Vonder, Erik Demeulemeester, Willy Herroelen:
A classification of predictive-reactive project scheduling procedures. J. Sched. 10(3): 195-207 (2007) - 2006
- [j14]Jeroen Beliën, Erik Demeulemeester:
Scheduling trainees at a hospital department using a branch-and-price approach. Eur. J. Oper. Res. 175(1): 258-278 (2006) - [j13]Jeroen Beliën, Erik Demeulemeester, Brecht Cardoen:
Visualizing the Demand for Various Resources as a Function of the Master Surgery Schedule: A Case Study. J. Medical Syst. 30(5): 343-350 (2006) - 2004
- [j12]Erik Demeulemeester:
Book Review/Project Scheduling with Time Windows and Scarce Resources by Klaus Neumann, Christoph Schwindt and Jürgen Zimmermann. J. Sched. 7(6): 501-502 (2004) - 2003
- [j11]Mario Vanhoucke, Erik Demeulemeester, Willy Herroelen:
Progress payments in project scheduling problems. Eur. J. Oper. Res. 148(3): 604-620 (2003) - [j10]Erik Demeulemeester, Mario Vanhoucke, Willy Herroelen:
RanGen: A Random Network Generator for Activity-on-the-Node Networks. J. Sched. 6(1): 17-38 (2003) - 2002
- [j9]Mario Vanhoucke, Erik Demeulemeester, Willy Herroelen:
Discrete time/cost trade-offs in project scheduling with time-switch constraints. J. Oper. Res. Soc. 53(7): 741-751 (2002) - 2001
- [j8]Mario Vanhoucke, Erik Demeulemeester, Willy Herroelen:
An Exact Procedure for the Resource-Constrained Weighted Earliness-Tardiness Project Scheduling Problem. Ann. Oper. Res. 102(1-4): 179-196 (2001) - [j7]Willy Herroelen, Erik Demeulemeester, Bert De Reyck:
A note on the paper "Resource-constrained project scheduling: Notation, classification, models and methods" by Brucker et al. Eur. J. Oper. Res. 128(3): 679-688 (2001) - [j6]Mario Vanhoucke, Erik Demeulemeester, Willy Herroelen:
On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints. Manag. Sci. 47(8): 1113-1121 (2001) - 1998
- [j5]Willy Herroelen, Bert De Reyck, Erik Demeulemeester:
Resource-constrained project scheduling: A survey of recent developments. Comput. Oper. Res. 25(4): 279-302 (1998) - [j4]Erik Demeulemeester, Bert De Reyck, Bram Foubert, Willy Herroelen, Mario Vanhoucke:
New computational results on the discrete time/cost trade-off problem in project networks. J. Oper. Res. Soc. 49(11): 1153-1163 (1998) - 1997
- [j3]Willy Herroelen, Patrick Van Dommelen, Erik Demeulemeester:
Project network models with discounted cash flows a guided tour through recent developments. Eur. J. Oper. Res. 100(1): 97-121 (1997) - [j2]Erik L. Demeulemeester, Willy S. Herroelen:
A Branch-and-Bound Procedure for the Generalized Resource-Constrained Project Scheduling Problem. Oper. Res. 45(2): 201-212 (1997) - 1993
- [j1]Erik Demeulemeester, Bajis Dodin, Willy Herroelen:
A Random Activity Network Generator. Oper. Res. 41(5): 972-980 (1993)
Conference and Workshop Papers
- 2011
- [c1]Stefan Creemers, Erik Demeulemeester, Stijn Van de Vonder:
Project risk management: A new approach. IEEM 2011: 839-843
Coauthor Index
aka: Willy S. Herroelen
manage site settings
To protect your privacy, all features that rely on external API calls from your browser are turned off by default. You need to opt-in for them to become active. All settings here will be stored as cookies with your web browser. For more information see our F.A.Q.
Unpaywalled article links
Add open access links from to the list of external document links (if available).
Privacy notice: By enabling the option above, your browser will contact the API of unpaywall.org to load hyperlinks to open access articles. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the Unpaywall privacy policy.
Archived links via Wayback Machine
For web page which are no longer available, try to retrieve content from the of the Internet Archive (if available).
Privacy notice: By enabling the option above, your browser will contact the API of archive.org to check for archived content of web pages that are no longer available. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the Internet Archive privacy policy.
Reference lists
Add a list of references from , , and to record detail pages.
load references from crossref.org and opencitations.net
Privacy notice: By enabling the option above, your browser will contact the APIs of crossref.org, opencitations.net, and semanticscholar.org to load article reference information. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the Crossref privacy policy and the OpenCitations privacy policy, as well as the AI2 Privacy Policy covering Semantic Scholar.
Citation data
Add a list of citing articles from and to record detail pages.
load citations from opencitations.net
Privacy notice: By enabling the option above, your browser will contact the API of opencitations.net and semanticscholar.org to load citation information. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the OpenCitations privacy policy as well as the AI2 Privacy Policy covering Semantic Scholar.
OpenAlex data
Load additional information about publications from .
Privacy notice: By enabling the option above, your browser will contact the API of openalex.org to load additional information. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the information given by OpenAlex.
last updated on 2024-10-23 20:35 CEST by the dblp team
all metadata released as open data under CC0 1.0 license
see also: Terms of Use | Privacy Policy | Imprint